Stingray
06-07-2002, 10:48 AM
Here is my problem.......
I had plans to start a cycle about 2 weeks ago. Unfortunately my package has not arrived (waited 7 weeks + 2 days). I have ordered from this source before and received in about 3 and 1/2 weeks.
I have to be finished the cycle by a certain date, because I am leaving the country, and if I start now I will be able to do a full 10 week cycle as planned. If I do not start by this Sunday, I will have to reduce the length of my cycle accordingly.
The cycle I planned on was 500mg Sust per week, 200mg Deca per week, 25mg of D-bol ED for the first 5-6 weeks.
I have not received the Deca or the D-bol. I do, however, have some Sust250.
If you were in my shoes, would you:
1. Wait a little longer and hope the gear showed up soon and do an 8 or 9 week cycle instead of the 10. (This would only work out assuming the gear actually shows up within the next 2 weeks. If it doesn't show up in time, I will be forced to do an 8 week cycle with only sust.)
2. Start with 500mg of sust250 and do a 10 week cycle of only sust.
Any comments, advice, or opinions would be much appriciated.
Thanks.
P.S. I am a patient person and have dealt with the source before so I waited 5 weeks before e-mailing the source to see what was wrong. I was then told that, due to unforseen circumstances, my order was not sent yet and he would send it in 2 days! Today it is exactly two weeks from the date he says he sent it. Hence the 7weeks + 2 days.
I had plans to start a cycle about 2 weeks ago. Unfortunately my package has not arrived (waited 7 weeks + 2 days). I have ordered from this source before and received in about 3 and 1/2 weeks.
I have to be finished the cycle by a certain date, because I am leaving the country, and if I start now I will be able to do a full 10 week cycle as planned. If I do not start by this Sunday, I will have to reduce the length of my cycle accordingly.
The cycle I planned on was 500mg Sust per week, 200mg Deca per week, 25mg of D-bol ED for the first 5-6 weeks.
I have not received the Deca or the D-bol. I do, however, have some Sust250.
If you were in my shoes, would you:
1. Wait a little longer and hope the gear showed up soon and do an 8 or 9 week cycle instead of the 10. (This would only work out assuming the gear actually shows up within the next 2 weeks. If it doesn't show up in time, I will be forced to do an 8 week cycle with only sust.)
2. Start with 500mg of sust250 and do a 10 week cycle of only sust.
Any comments, advice, or opinions would be much appriciated.
Thanks.
P.S. I am a patient person and have dealt with the source before so I waited 5 weeks before e-mailing the source to see what was wrong. I was then told that, due to unforseen circumstances, my order was not sent yet and he would send it in 2 days! Today it is exactly two weeks from the date he says he sent it. Hence the 7weeks + 2 days.